鋼(gāng)襯塑管道要避免陽光的暴曬,遠離火(huǒ)源熱源(yuán),也要注意防潮。
產品的兩頭端麵處有鐵,塑(sù)料或木質盲板,或木箱、軟紙包裝。
鋼襯塑管道(dào)在安裝前(qián)方可拆除盲(máng)板,出箱,包裝拆除或出箱(xiāng)後應(yīng)及時安裝,不可長時(shí)間放置或移動,在低溫高寒地區注意產品保溫。
鋼(gāng)襯塑是鋼塑複合儲罐係列產品的精(jīng)華。將鋼網焊接於鋼體表麵,以聚乙烯為原料,采用旋塑工藝(yì)一次整體(tǐ)成型於鋼體(tǐ)表麵,由於鋼網與聚乙烯為一體且鋼網焊於鋼體表麵,使聚乙烯難以脫離鋼(gāng)體表麵。
鋼在裝(zhuāng)卸過程中要注意保護鋼(gāng)襯(chèn)塑管道外的防腐(fǔ)漆和其它鍍附包裝,防止鋼管表麵腐蝕。
不能用叉車裝卸,因為管道兩端口做了密封,防止襯裏層刮蹭延長管道使用期限。
到(dào)貨後(hòu)的(de)管道保證安全的前提下,地麵有木墊堆(duī)碼,要求碼垛穩固,注意(yì)安放平直,管道按規格型號做好標記,在入庫前要做好(hǎo)防止雨淋和弄汙,有汙(wū)漬的表麵可以用棉麻布等物擦幹淨。
Steel lined plastic pipes should be protected from the sun, away from fire and heat sources, and pay attention to moisture protection.
There are iron, plastic or wooden blind plates, or wooden cases and soft paper packaging at the two end faces of the product.
The blind plate of steel lined plastic pipe can be removed before installation, and it shall be installed in time after removal of packaging or out of the box. It shall not be placed or moved for a long time. Pay attention to product insulation in low temperature and high cold areas.
Steel plastic lining is the essence of steel plastic composite storage tank series products. The steel mesh is welded on the surface of the steel body, and polyethylene is used as raw material, which is integrally formed on the surface of the steel body at one time by rotary molding process. Because the steel mesh is integrated with polyethylene and the steel mesh is welded on the surface of the steel body, it is difficult for polyethylene to separate from the surface of the steel body.
During the loading and unloading of steel, attention shall be paid to protecting the anti-corrosion paint and other plated packaging outside the steel lined plastic pipe to prevent the surface corrosion of the steel pipe.
The forklift cannot be used for loading and unloading, because the two ends of the pipeline are sealed to prevent the lining layer from scraping and prolong the service life of the pipeline.
On the premise of ensuring the safety of the pipes after arrival, wooden mats shall be stacked on the ground. The stacking shall be stable, and the pipes shall be placed straight and straight. The pipes shall be marked according to the specifications and models. Before warehousing, they shall be protected from rain and contamination. The stained surface can be cleaned with cotton linen and other objects.


0571-82401171 / 18967181785