0571-82401171 / 18967181785
國家標準GB18564.2-2008起草單位(wèi)

浙(zhè)江榴莲视频APP下载防腐設備有限公司

你對(duì)鋼襯塑儲(chǔ)罐的了解有多少?

2018-07-17 11:21

鋼襯(chèn)塑儲罐

鋼襯塑儲罐具備什麽樣(yàng)的優點(diǎn)?
What are the advantages of a steel lining plastic storage tank?
鋼襯塑儲罐具(jù)有無焊(hàn)接縫、不滲漏、無毒性、抗老化、抗衝擊、耐腐蝕、壽命長、符合衛生標準等優點。與傳統的鋼襯塑料板儲槽、鋼襯橡膠儲罐、鋼襯玻璃(lí)鋼貯槽相比,具有更良好的耐腐蝕、不滲漏、不剝離、耐磨損(sǔn)、可(kě)耐一定壓力、可耐較高溫(wēn)度、壽命(mìng)更長等優點。
The steel lined plastic storage tank has the advantages of no welded joints, no leakage, no toxicity, anti-aging, impact resistance, corrosion resistance, long life, and meets hygienic standards. Compared with the traditional steel lined plastic plate storage tank, steel lined rubber tank and steel lined fiberglass tank, it has the advantages of better corrosion resistance, no leakage, no peeling, wear resistance, resistance to certain pressure, high temperature and longer life.
鋼襯塑儲罐檢修該注意哪些因數?
What factors should pay attention to the maintenance of the steel lining plastic storage tank?
鋼襯塑儲罐檢修周期(qī)分為兩種:中修和大修,中修一般是2-4個月,大(dà)修一般是一年,對(duì)於中修的話,就是清(qīng)洗或更(gèng)換(huàn)液位計修理或更換進、出口及排汙閥門疏通清理冷卻(què)水盤管。檢查修理安全閥放空阻火器(qì),修補防腐層和絕熱層(céng)。大修就包括中(zhōng)修項目修理(lǐ)儲罐內件,對發現有裂紋,嚴(yán)重腐蝕(shí)等部位,相應修補或更換筒(tǒng)節。根據內外部檢驗要求,以及經過(guò)修補或更換筒節後,進行試漏,對成(chéng)功內外部檢驗中發現的其(qí)他問題進行處理(lǐ)。
The repair period of steel liner plastic storage tank is divided into two kinds: medium repair and overhaul, the middle repair is generally 2-4 months, the overhaul is usually one year. For the middle repair, it is the cleaning or replacement of the liquid level meter repair or replacement, the exit and the discharge valve dredging and clearing the cooling water coil. Check and repair the relief valve, release the flame arrester, repair the anticorrosive coating and heat insulation layer. The overhaul includes repairing items in the middle repair items, repairing or replacing cylinder sections for cracks and serious corrosion. According to internal and external inspection requirements, and after repair or replacement of cylinder sections, leak test is carried out to deal with other problems found in successful internal and external inspection.